Thursday, February 28, 2013

doors and cabinets

Lots of pretty things happening in the basement.
Lighting is finished with the exception of a few hanging lights. The doors have been hung, most of the trim is up and the cabinets were installed yesterday. Our flooring was bumped to next week, so trim work can keep plugging along.

DSC_2820a
In the Bison Booties studio - doors to outside, and french doors to the game room and family room.

DSC_2816
I really like these doors! There is a protective coating on the glass, when removed it will be clear glass. And Kya's little doorway to the play space under the stairs.

doors1
Studio on left, stairs, family/media room on right

doors2a
The Bison Booties studio

DSC_2839
The wet bar (Corey's man cave). The bar will have a higher "bar" raised side with stools, which is currently being built.

DSC_2840
The inside of the bar: sink will be on far left, outward-facing shelving on corner (for media electronics), storage cabinets, and a cubby for the mini fridge. Cabinets are cherry in color mocha (same as we have upstairs).

DSC_2841
Bathroom. Kya is very excited for the toilet to be installed next week. Each time we go downstairs she tells me how she will potty and poo poo in the new potty chair. Oh the joys.

No comments:

Post a Comment